Standard Documents
All ACA standard documents and guides are sold through the local construction associations only. Their contact information can be found here.
CCDC 2 (2020), CCDC 3 (1998), CCDC 4 (2011), CCDC 5B (2010), CCDC 14 (2013), CCDC 17 (2010) and CCDC 18 (2001) Supplementary General Conditions for Use in Alberta
These Supplementary General Conditions are mandatory when using any of the above listed Contracts in Alberta.
Click on a link below for free download:
2020 Trade Definitions
Intended to assist companies in identifying work to be included or excluded in the bids of Trade Contractors.
Click here for free download or go directly to the site: www.tradedefinitions.com
ACA Form A |
Agreement Between Contractor & Subcontractor Standard contract between the prime contractor and subcontractor. *Requires the Form A Seal* This document is available in either Electronic or Hard Copy version through the local construction associations. |
|
Form A Seal |
Form A Copyright Seal Required for use of the Form A standard contract |
|
ACA Form B |
Agreement Between Subcontractor & Sub-Subcontractor Standard contract between the Subcontractor and Sub-Subcontractor. *Requires the Form B Seal* This document is available in either Electronic or Hard Copy version through the local construction associations. |
|
Form B Seal |
Form B Copyright Seal Required for use of the Form B standard contract |
|
ACA Form C |
AB Standard Guide for Take-over Procedures Recommended procedures concerning final completion and take-over of construction projects |
|
Form C Sup 1 |
Certificate of Substantial Performance of Prime Contract Used by Prime Contractor to verify work is substantially complete and holdback monies withheld under the contract are to be released in accordance with timing stipulated by the Builders’ Lien Act. Work continues towards total completion. *Refer to ACA Standard Guide for Take-Over Procedures (Document C) |
|
Form C Sup 2 |
Certificate of Substantial Performance of Subcontract Used by Subcontractor to verify work is substantially complete and holdback monies withheld under the contract are to be released in accordance with timing stipulated by the Builders’ Lien Act. Work continues towards total completion. *Refer to ACA Standard Guide for Take-Over Procedures (Document C) |
|
ACA Guides | Plain Language Guide to The Alberta Builders’ Lien Act Intended to assist participants in the construction industry in understanding and generally dealing with the builders’ lien issues in a reasonably informed manner. |
|
Plain Language Guide to Construction Insurance Intended to give participants in the construction industry a broad overview of the types of insurance coverage available along with offering insights into the processes and practices to deal with insurance matters relating to the construction industry |
||
Plain Language Guide on Bonding Intended to complement CCDC 22 – A Guide to Construction Surety Bonds. CCDC documents are endorsed by Alberta Construction Association as the standard for the Canadian construction industry |
||
Plain Language Guide Fleet Safety & Compliance Intended to assist companies that operate light commercial vehicles as well as heavy commercial vehicles. |
||
Silica Guides | HSE Best Practice Intended to help companies to protect themselves and their employees against silica dust. |
|
HSE Silica Operating Procedure The purpose of this procedure is to specify methods to protect workers who may be exposed to respirable crystalline silica in construction activities. |