4D (scheduling) and 5D (estimating) modeling are revolutionizing how buildings are designed and built. However, misconceptions are prevalent about the use of this technology. The top five misconceptions are:

1. It is easy

2. It is too expensive

3. That you need to 4D the whole project

4. It requires a highly skilled technician

5. It is a cure all for projects

Read more about these misconceptions at ConstructionPro

Sorry, the comment form is closed at this time.

   
© 2012 Alberta Construction Association Suffusion theme by Sayontan Sinha